Upper Methow River Reach Assessment w/ Appendices
A Reach Assessment of the Upper Methow River was completed in 2015 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment of the Upper Methow River was completed in 2015 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment and restoration Strategy for the Middle Twisp River (Methow) was completed in 2015 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A 2011 Project Opportunity Assessment for the Methow River between Twisp River and Lewisia Road conducted by Inter-Fluve for YN (no appendices) Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment of Beaver Creek (Methow Subbasin) was completed in 2017 by Tetra Tech for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Preliminary Reach Analysis of Tumwater Canyon of the Wenatchee River conducted by Entrix for WDOT in 2009.
A Tributary and Reach Assessment (RA) with all Appendices of the Lower Peshastin Creek, Chelan County, WA was completed in 2010 by Inter-Fluve for YN Upper Columbia Habitat Restoration Project (#2009-003-00).
An Assessment of Geologic and Ecologic Indicators of Lower Nason Creek, Chelan County, WA was completed in 2011 by the USBR.
A Project Identification for the Inner-Zone of the Lower White Pine Reach (LWP) of Nason Creek, Chelan County, WA was completed in 2011 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment (RA) of the Kahler Reach of Nason Creek, Chelan County, WA was completed in 2009 by the USBR.
In 2008 the BOR completed an assessment of physical river processes and associated habitat for spring Chinook and steelhead in Nason Creek, a tributary to the Wenatchee River.