USFS Habitat Restoration Concepts for Chewuch River
A 2010 Report prepared by Inter-Fluve summarizing restoration opportunities on US Forest Lands in the Chewuch River area for the YN Upper Columbia Habitat Restoration Project (#2009-003-00)
A 2010 Report prepared by Inter-Fluve summarizing restoration opportunities on US Forest Lands in the Chewuch River area for the YN Upper Columbia Habitat Restoration Project (#2009-003-00)
A concept design report for the Twisp River Mile 0.5, prepared by Inter-Fluve for YN Upper Columbia Habitat Restoration Project (#2009-003-00).
Draft Regional Technical Team/ YN Workgroup Memo on the Upper Wenatchee Reach Assessment Implementation for the Upper Columbia Habitat Restoration Project (#2009-003-00).
Assessment of large wood and recreation in Nason Creek, Wenatchee Subbasin, for the Yakama Nation Upper Columbia Habitat Restoration Project (#2009-003-00)
A Reach Assessment (RA) of the 3-D Reach of the Entiat River was completed in 2010 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment for the Stillwaters reach of the Entiat River was completed in 2013 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A DRAFT Reach Assessment for the Mad River (Entiat Subbasin) was completed in 2018 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment of Lower Libby Creek (Methow) was completed in 2012 by the Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment of the Lower Twisp River (Methow) was completed in 2010 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).
A Reach Assessment for the Chewuch River (Methow) was completed in 2015 by Inter-Fluve for the YN Upper Columbia Habitat Restoration Project (#2009-003-00).